DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-06-02

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth ~-13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:07.03 18:06

  • NIGERIA | LAGOS:07.03 19:06

  • EGYPT | CAIRO:07.03 20:06

  • UAE | DUBAI:07.03 22:06

  • SRI LANKA | COLOMBO:07.03 23:36

  • SINGAPORE:07.04 02:06

  • ENGLAND | LONDON:07.03 19:06

  • RUSSIA | MOSCOW:07.03 22:06

  • CHINA | BEIJING:07.04 02:06

  • AMERICA | Los Angels:07.03 11:06

  • AMERICA | New York:07.03 14:06

  • BRAZIL | San Paulo:07.03 15:06