DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-06-02

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth ~-13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:05.10 19:38

  • NIGERIA | LAGOS:05.10 20:38

  • EGYPT | CAIRO:05.10 21:38

  • UAE | DUBAI:05.10 23:38

  • SRI LANKA | COLOMBO:05.11 01:08

  • SINGAPORE:05.11 03:38

  • ENGLAND | LONDON:05.10 20:38

  • RUSSIA | MOSCOW:05.10 23:38

  • CHINA | BEIJING:05.11 03:38

  • AMERICA | Los Angels:05.10 12:38

  • AMERICA | New York:05.10 15:38

  • BRAZIL | San Paulo:05.10 16:38