Its construction area is 30km in length and designed with bottom width of 315m and water depth -19.5m, and the dredging work quantity is 33,000,000m3.
SENEGAL | DAKAR:03.30 02:14
NIGERIA | LAGOS:03.30 03:14
EGYPT | CAIRO:03.30 04:14
UAE | DUBAI:03.30 06:14
SRI LANKA | COLOMBO:03.30 07:44
SINGAPORE:03.30 10:14
ENGLAND | LONDON:03.30 03:14
RUSSIA | MOSCOW:03.30 06:14
CHINA | BEIJING:03.30 10:14
AMERICA | Los Angels:03.29 19:14
AMERICA | New York:03.29 22:14
BRAZIL | San Paulo:03.29 23:14