Its construction area is 30km in length and designed with bottom width of 315m and water depth -19.5m, and the dredging work quantity is 33,000,000m3.
SENEGAL | DAKAR:01.30 20:28
NIGERIA | LAGOS:01.30 21:28
EGYPT | CAIRO:01.30 22:28
UAE | DUBAI:01.31 00:28
SRI LANKA | COLOMBO:01.31 01:58
SINGAPORE:01.31 04:28
ENGLAND | LONDON:01.30 21:28
RUSSIA | MOSCOW:01.31 00:28
CHINA | BEIJING:01.31 04:28
AMERICA | Los Angels:01.30 13:28
AMERICA | New York:01.30 16:28
BRAZIL | San Paulo:01.30 17:28