Its construction area is 30km in length and designed with bottom width of 315m and water depth -19.5m, and the dredging work quantity is 33,000,000m3.
SENEGAL | DAKAR:11.04 04:59
NIGERIA | LAGOS:11.04 05:59
EGYPT | CAIRO:11.04 06:59
UAE | DUBAI:11.04 08:59
SRI LANKA | COLOMBO:11.04 10:29
SINGAPORE:11.04 12:59
ENGLAND | LONDON:11.04 05:59
RUSSIA | MOSCOW:11.04 08:59
CHINA | BEIJING:11.04 12:59
AMERICA | Los Angels:11.03 21:59
AMERICA | New York:11.04 00:59
BRAZIL | San Paulo:11.04 01:59