The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.
SENEGAL | DAKAR:01.30 22:11
NIGERIA | LAGOS:01.30 23:11
EGYPT | CAIRO:01.31 00:11
UAE | DUBAI:01.31 02:11
SRI LANKA | COLOMBO:01.31 03:41
SINGAPORE:01.31 06:11
ENGLAND | LONDON:01.30 23:11
RUSSIA | MOSCOW:01.31 02:11
CHINA | BEIJING:01.31 06:11
AMERICA | Los Angels:01.30 15:11
AMERICA | New York:01.30 18:11
BRAZIL | San Paulo:01.30 19:11