The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.
SENEGAL | DAKAR:03.30 03:37
NIGERIA | LAGOS:03.30 04:37
EGYPT | CAIRO:03.30 05:37
UAE | DUBAI:03.30 07:37
SRI LANKA | COLOMBO:03.30 09:07
SINGAPORE:03.30 11:37
ENGLAND | LONDON:03.30 04:37
RUSSIA | MOSCOW:03.30 07:37
CHINA | BEIJING:03.30 11:37
AMERICA | Los Angels:03.29 20:37
AMERICA | New York:03.29 23:37
BRAZIL | San Paulo:03.30 00:37