DREDGING WORK FOR NAVIGATIONAL CHANNEL OF GUANGZHOU PORT

Published:2015-08-05

 

 

 

 

The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.

SITE MAP

World Time

  • SENEGAL | DAKAR:01.30 22:11

  • NIGERIA | LAGOS:01.30 23:11

  • EGYPT | CAIRO:01.31 00:11

  • UAE | DUBAI:01.31 02:11

  • SRI LANKA | COLOMBO:01.31 03:41

  • SINGAPORE:01.31 06:11

  • ENGLAND | LONDON:01.30 23:11

  • RUSSIA | MOSCOW:01.31 02:11

  • CHINA | BEIJING:01.31 06:11

  • AMERICA | Los Angels:01.30 15:11

  • AMERICA | New York:01.30 18:11

  • BRAZIL | San Paulo:01.30 19:11