The navigational channel of Guangzhou Port has a total length of 115km and water depth within -8.6m dredging depth -13.5m. The Lingding navigational channel has been dredged to be -15.5m in depth and the dredging work quantity exceeds 120,000,000m3.
SENEGAL | DAKAR:05.11 04:29
NIGERIA | LAGOS:05.11 05:29
EGYPT | CAIRO:05.11 06:29
UAE | DUBAI:05.11 08:29
SRI LANKA | COLOMBO:05.11 09:59
SINGAPORE:05.11 12:29
ENGLAND | LONDON:05.11 05:29
RUSSIA | MOSCOW:05.11 08:29
CHINA | BEIJING:05.11 12:29
AMERICA | Los Angels:05.10 21:29
AMERICA | New York:05.11 00:29
BRAZIL | San Paulo:05.11 01:29